By: Darren Bonawitz

In this post, a continuation of an ongoing blog series about colocation power, we will be taking a look at electric utility grids/substations. Keep in mind that this is not meant to be a comprehensive discussion but rather a starting point and high level overview of things to consider in regard to grids/substations and colocation. When searching for a colocation provider, or when verifying that your current provider meets your needs, ask the data center or colocation provider what the makeup is for its power grids. A grid serves a specific geographical area and is a network of all the elements, such as power lines and transformers that are necessary to distribute power to a particular area. Some facilities will only be on one power grid whereas some will have the luxury of dual power grids (some even more). This means that if one side of the grid were to fail for any reason, the second could potentially supply power adding an extra level of redundancy.
If a facility does have dual power grids, I recommend making sure it has an automatic transfer switch (ATS), which will automatically switch from grid one to grid two without manual intervention. Speaking of ATSs, make sure there is also an ATS between the utility power and backup power infrastructure. In fact, be sure to ask to see the generator servicing your equipment. Believe it or not, we are aware of unscrupulous data center operators who claim to have generator support when they in fact do not. We will discuss generator support more in a later post. Another item I recommend checking into is whether the transmission lines between the power plant and substation as well as the substation and colocation facility are underground. I won’t go so far as to say it should be a requirement to have underground transmission lines, but I do think it is a competitive advantage if you are comparing facilities that otherwise appear equal.
Tags: 1102 GRAND, automatic transfer switch, backup generators, cabinet level PDUs, colocation provider, colocation services, data center, data center cost, data center network, data center operations, data center server, data center servers, data colocation, datacenter, efficiency, electric company, electric energy, electric utility grid, electric utility substation, electrical, electrical energy, electrical substations, electricity, Energy, energy advantages, energy conservation, energy cost, energy saving, energy savings, energy-efficiency, facility, floor level power distribution units, generation power, generator transfer switch, green data center, green energy, Green IT, greening it, hardware, hardware maintenance, heating and air, heating and cooling, heating and cooling system, heating and cooling systems, heating systems, Interconnection, Internet Hub, Internet hub and data center, Internet Service Prodiver, IT, IT infrastructure, it infrastructure management, Kansas City Power & Light, Midwest data center, Midwest Internet hub, PDUs, plant power, plants power, power, power connector, power generation, power generator, power generators, power loss, power one, power plant, power plants, power protection, power service, power supply, processor.com, Public Utility Commission, Raw Space, remote facility, save energy, server, server colocation, source energy, sources energy, sources of energy, substation design, substations, substations electrical, supply power, sustainable energy, telecommunications, transfer switch, transmission lines, uninterruptable power supplies, utility companies, utility company, utility energy, utility grids