Posts Tagged ‘energy-efficiency’
09 - 01 - 10
By: Darren Bonawitz

In this post, a continuation of an ongoing blog series about colocation power, we will be taking a look at electric utility grids/substations. Keep in mind that this is not meant to be a comprehensive discussion but rather a starting point and high level overview of things to consider in regard to grids/substations and colocation. When searching for a colocation provider, or when verifying that your current provider meets your needs, ask the data center or colocation provider what the makeup is for its power grids. A grid serves a specific geographical area and is a network of all the elements, such as power lines and transformers that are necessary to distribute power to a particular area. Some facilities will only be on one power grid whereas some will have the luxury of dual power grids (some even more). This means that if one side of the grid were to fail for any reason, the second could potentially supply power adding an extra level of redundancy.
If a facility does have dual power grids, I recommend making sure it has an automatic transfer switch (ATS), which will automatically switch from grid one to grid two without manual intervention. Speaking of ATSs, make sure there is also an ATS between the utility power and backup power infrastructure. In fact, be sure to ask to see the generator servicing your equipment. Believe it or not, we are aware of unscrupulous data center operators who claim to have generator support when they in fact do not. We will discuss generator support more in a later post. Another item I recommend checking into is whether the transmission lines between the power plant and substation as well as the substation and colocation facility are underground. I won’t go so far as to say it should be a requirement to have underground transmission lines, but I do think it is a competitive advantage if you are comparing facilities that otherwise appear equal.
08 - 27 - 10
By: Darren Bonawitz

When selecting a colocation provider, many believe that power is one of the most important considerations. Reliable and cost-effective power is imperative to an economically and technically viable data center, as nearly everything in a data center relies on it. It impacts data equipment such as routers, switches and servers. Power also affects supporting infrastructure including everything from lighting to cooling units. Furthermore, power constitutes a considerable portion of the colocation charges incurred by customers. Selecting a facility with not only reliable but competitively priced power is important in order to decrease your organization’s operating expenses. I discussed this in my previous blog post on Aug. 18th and have decided to expand on power in a series of blog posts due to its importance in a colocation environment.
There are many physical components that make up a data center’s power infrastructure. Knowing what these are will help you understand what quality data centers do differently than others who cut corners. The components that I will discuss in the blog series include: the utility company that provides power to the data center, utility grids/substations, uninterruptable power supplies (UPSs), floor level power distribution units (PDUs), cabinet level PDUs (sometimes referred to as power strips) and backup generators. For today’s blog post I am going to cover the electric utility company.
Utility Company
Power is usually supplied to a data center by a large utility company. Different utility companies are more reliable than others and you should take their history of power outages into consideration when choosing your colocation provider. Some areas of the country are simply more prone to events such as brownouts or blackouts due to the age and capacity of the existing power generation and distribution infrastructure. For example, the blackout of 2003 devastated much of the Northeast United States, causing billions of dollars of losses to businesses. While Kansas City has very reliable infrastructure and one of the most reliable utility companies (Kansas City Power & Light) in the country, not all markets are as fortunate. Several areas experiencing explosive population growth and density or those that have recently experienced a high level of increasing demand (i.e. new data centers) that are fed by old or strained infrastructure may be more prone to brownouts or blackouts. This is important to know if you are in a mission critical environment and are considering a data center powered by that utility company. To research the utility company, we suggest contacting the Public Utility Commission and asking for disclosers on the company to learn the frequency and instances of power loss.
08 - 18 - 10
By: Darren Bonawitz
I came across this article on CNN the other day about power blackouts increasing at an alarming rate. When you are in the data center business, that is not a comforting thought, unless of course your role in the industry is selling generators. As data centers continue to grow, demand more power, and increase strain on electric utilities, some data centers (and their customers as well) are likely to be facing uneasy times. When deciding where to build data centers, it is easy to focus primarily on price. If you are going to be utilizing a lot of power, a low cost per kilowatt hour (kWh) rate is important to the bottom line. At the same time, it is important not to focus exclusively on cost. Instead, it is important to balance risk tolerance with economics and match electric utility costs with both reliability and the ability to scale for future demand.
Organizations that do not build data centers and instead opt for colocation are not off the hook with regard to this either. These are essentially pass through criteria to customers of data centers and can have a profound impact on a company’s uptime, growth, and operational expenses. Fortunately, 1102 GRAND is fortunate enough to have Kansas City Power & Light (KCP&L) as our electric utility. Not only do they provide competitive rates, but we also have a low risk of black outs thanks to efficient and well designed energy delivery infrastructure systems. In fact, KCP&L is routinely named the most reliable electric utility in the region, and in 2008 they were even named the most reliable electric utility in the nation. Not all data centers can boast that they are fed by such a reliable and cost effective electric utility, and for that we are certainly thankful.
U.S. electricity blackouts skyrocketing
08 - 09 - 10
Posted by: Greg Elliott
A big thanks to processor.com for interviewing Darren Bonawitz, co-owner of 1102 GRAND, about the importance of local electric utility companies when choosing a location for a new data center, or in repairing an existing one.
According to the article, “The power entering the data center is, obviously, critically important to steady uptime. An unreliable source of power can cripple data center operations by introducing an unexpected variable that’s completely out of administrator control. Administrators engaged in data center design and construction must carefully analyze power considerations.
A primary power-related consideration is the need to ensure that the local utility is able to provide plenty of power reliably and consistently. Darren Bonawitz, co-owner of 1102 GRAND (www.1102grand.com), a data center in Kansas City, Mo., says administrators should talk with the electric utility company to ensure that the location they are looking at has adequate access to power not only for today’s needs but also to support future growth. A planned data center expansion can quickly get derailed if a local utility cannot supply the additional power required for expansion.”

07 - 23 - 10
By: Darren Bonawitz
Many companies are turning to renewable energy to power their facilities and decrease their carbon footprints. With data centers being one of the largest users of energy, turning to renewable energy may be in the near future. But is this plausible? Renewable energy must first scale to accommodate data centers to meet their power requirements. Secondly, renewable energy must be cost-effective solution for data centers because even one center per kilowatt hour (kWhr) higher in a data center is a considerable strain on profits. Finally in order to rely solely on renewable energy it has to be a reliable option.
We won’t get there without research and baby steps in the right direction, coupled with innovation incentives to entrepreneurs and researchers to keep driving them towards creating better solutions.
To learn more about data centers and renewable energy visit datacenterknowledge.com
05 - 13 - 10
Posted By: Darren Bonawitz
I want to share the recent event calendar of summer training courses for SecureSkills hosted by Fishnet Security. The first upcoming event in Kansas City is the National F5 Networks Course from May 17-21, 2010.

05 - 07 - 10
Posted By: Darren Bonawitz
I want to share a few photos from our April 1, 2010 IT Networking Event at Boulevard Brewery.



03 - 16 - 10
By: Greg Elliott
Hi, I’m Greg Elliott with 1102 GRAND, Kansas City’s carrier hotel and collocation facility. Thanks for taking the time to join me for another podcast concerning what we’re seeing out there in the collocation industry. Today, I’m going to focus on why networking events are important to 1102 GRAND to facilitate the growth of the IT and the telecom community in the area. 1102 GRAND is a major hub for voice and data traffic in the midwest and we see a lot of deals come through the doors and we offer to help in any way we can. Whether it’s a potential customer who needs cabinet or cage space, or just needs a recommendation on who they should go to for their solution to their problem. We always try and help.
For years, we have sponsored networking events to help bring people together. We have our annual golf tournament, our Boulevard Brewery event, along with other informal events throughout the year. We find that when you bring individuals together in a relaxed atmosphere people share ideas, and in turn, deals happen. So we feel it’s our place in the community to be a hub for the commerce, as well as a hub for the internet. I invite you to come take a look at what we’re building at 1102 GRAND.
Click here to register for the April 1st networking event at Boulevard Brewery
03 - 12 - 10
By: Darren Bonawitz
Here are some ways to go green.
1. Start with a energy audit to determine current carbon footprint and serve as a baseline for
measurement
2. Install blanking panels to prevent air mixing between hot and cold aisles
3. Maintain proper under floor static pressure
4. Ensure the area under raised floors are as free from debris/congestion as possible
5. Replace older computer room air conditioners (CRACs) with newer and more energy efficient models
6. Implement hot aisle/cold aisle concepts including containment strategies
7. Utilize virtualization to reduce server footprint
8. Utilize low power servers when applicable
9. Convert from three-way to two-way valve CRAC Units
10. Invest in a robust environmental monitoring and control system
11. Measure temperature at the front of the cabinets and make temperature control decisions on that data
12. Replace older networking gear with more energy efficient models
13. Utilize “free cooling” if the geographical environment makes it possible
14. Evaluate replacing metal-halide fluorescent fixtures with T5HO lighting
15. Determine reasonable goals and a realistic plan and get going on a set date rather than always waiting
until tomorrow
03 - 08 - 10
Click here to register: